Home |  My Cart |  My Account | Login

Home > Retrofit Masterflash-Square Base Retrofit Flashing >  

#1 Black EPDM Retrofit Masterflash®

 



1. Choose the appropriate Retrofit Masterflash®.  If necessary trip the opening to to about 20% smaller than the pipe diameter.
2. Wrap the Retrofit around the pipe and install all snap rivets to seal the flange.
3. Press the Masterflash® down, bending it to conform to the roof profile or roof irregularities.  A blunt tool will help press the flashing into tight roof angles.
4. Apply a silicone selant between the Masterflash® base & the roof.
5. Use fasteners to complete sealing.  For UPC installation, fastener spacing may not exceed 1½".
6. Install the supplied cable tie at the upper-most part of the Retrofit Masterflash® & apply sealant to any gaps.



Copyright 2010 Protech Products, Inc.